- Rich export experience
- 24/7 Hours Service
- Ready to Ship!
2036 aluminum this is an early application of a kind of hard aluminum, commonly known as standard hard aluminum, with moderate strength, annealing, quenching and hot state plasticity is good, heat treatment can be strengthened, quenching and natural aging state in use, spot welding weldability is good.
2036 aluminum alloy features: high strength, a certain heat resistance, can be used for working parts below 150℃. The strength of 2036 alloy is higher than that of 7075 alloy. The formability is better in hot state, annealing state and new quenching state, and the effect of heat treatment is remarkable, but the heat treatment process is strict. Corrosion resistance is general, but with pure aluminum coating can be effectively protected, but using a special process can be welded, also can be riveted.
Widely used in aircraft structures, rivets, truck wheels, propeller components and other structural parts.
Product Detail:
Shape: | Round |
Length: | Customized, 1000mm-12000mm or customized |
Wall Thickness: | 1-80mm |
Processing Service: | Bending, Decoiling, Welding, Punching, Cutting |
Type: | OEM ODM |
Standard: | GB, ASTM, EN, JIS, AISI, DIN |
Application: | Rail transit, automobile, electronics, electrics and other indust |
Surface Treatment: | Mill Finished |
Usage: | Industrial |
Temper: | T3 - T8 |
Model Number: | Customized |
Tolerance: | ±1% |
Diameter: | 10mm-400mm |
Certification: | CE, ISO9001, ISO14001, ISO45001, IATF16949 |
■ Roll casting
Aluminium ingot into quiet place furnace and vertical plate with casting machine, the thickness is 7.7 to 5.5 thick thick burrs, the 1060-1260-1360-1460-1560 and then transferred to the cold machine,, cold machine cutting quantity at least 3 cm,Casting of blank are generally burrs out, to the round edge, and then to the cold.
■ Cold rolling
Tied to the thickness we need, to 14 and 24, if it's 24, annealing directly.
■ Annealing
Annealing time probably in 12 hours.
■ Forced air cooling
The winter air about 12 hours, air-cooled 18 to 20 hours of summer can only be air cooled through finished product.
■ Packaging
Customize the packaging according to customer's requirements.